A comprehensive facility evaluation and prioritization effort indicated that the pool at Lawrence North High School was in need of a renovation and reuse of the original pool was not an option. Cripe was able to design a pool addition located in front of the main gym entrance, with competition and instructional capacity for the school programs.
Cripe provided Architecture, Civil Engineering, and Land Surveying services for this project.
The building addition also includes a concourse between the main gym and swimming pool that not only highlights the school's athletic accomplishments but also provides additional common area for the students.
Size 541,200 square feet (49,200 square feet additional) Construction Cost $ 14 million Completion 2009