Pike High School is expanding the existing seating capacity at its athletic complex along with other stadium enhancements.
Cripe Architects + Engineers provided Architecture, Land Surveying and Civil Engineering services for this project.
The seating capacity on the home-field side of the of the stadium will be increased by 500 seats and 800 seats will be replaced on the visitor side of the field. In addition, a concession stand will be built which also houses restrooms. A previously existing building on the premises will be developed into two new locker room facilities.
Size 3,260 sq. ft site for Concession stand
2,990 sq. ft. Home-field seating
7,900 sq. ft. Visitor seating
4,700 sq. ft. Locker room remodel Construction Cost $ 1.8 million Completion Under Construction