Clarian Health
Clarian Health was looking to replace and update old equipment with the newest technology available. The client’s aging equipment was becoming too slow to handle increased volume and patient input, causing significant down time for professional staff members.
Cripe Architects + Engineers provided Architectural and Equipment Planning services for this project.
Time constraints were a significant factor during this project, as the hospital ran at a high capacity/usage; down time of equipment and reduced space would put a strain on the processes of the hospital. Construction was completed in a high traffic, very tight, sensitive area, but was finished on time and on budget.
Cripe successfully integrated the world’s top technology into the hospital, drastically aiding the radiology and imaging departments. In one instance, the new design helped users because of the installation of push-plated doors which could be opened with one hand, therefore improving the speed and ease in which patients could be transported.
Size 1,000 square feet (each)
Construction Cost $ 1.5 million
Completion Various Projects 2006 - 2008
|