Garvin Governor Stringtown Pedestrian Corridor

Date: January 4, 2013

Located in downtown Evansville, this planned pedestrian trail is 8 miles long, connecting neighborhoods to schools, parks and amenities the area has to offer. Cripe completed the topographic survey and the schematic design services for this project, with construction document phase planned for 2012. The design included signage and signalization for pedestrian safety, striping and reconstruction of existing sidewalks and ADA ramps, as required. Federal funding will help achieve construction of this 8 mile trail in 2013.

Client: Evansville Parks Department

Completion Date: Estimated 2015

Construction Cost:  $300,000

Download Tearsheet Here