McWorter Road Water Main Replacement

Date: January 7, 2013

Cripe prepared construction documents and cost estimating for the design of a 865 LF water main replacement project. The project was design as a direction drill to allow the existing water main to remain in service during construction and have minimal impacts to roadways. A detailed map showing existing property lines and ease- ments was created to ensure that the new main would be locatedin a small area between the existing road and existing water main. Coordination with utility companies was also necessary in order to avoid conflicts and expensive relocations.

Client: Citizens Water

Completion Date: 2012

Construction Cost:  $65,000