Allpoints Midwest

Date: January 7, 2013

The final design of Building 1 entailed a 1,199,262 square foot building on 68.5 acres with truck docks, trailer parking areas and car parking areas. In addition, an on-site stormwater management system was added to include a pond and linear water quality basins which supply the fire protection system serving the building. To access the site and provide future access to the undeveloped property in the park, 3,980 linear feet of industrial roadway was designed in conjunction with the required 4,078 linear feet of 10” PVC sanitary sewer ranging in depth from 7 to 23 feet and water main extensions.

Client: Browning Investments

Completion Date: 2008

Construction Cost:  $49.7 million

download_tearsheet