The utility design for the site included an extensive off-site sanitary sewer main extension, an on-site sanitary sewer system that traversed the site to serve future undeveloped, adjacent properties, a storm water management system consisting of four interconnected dry detention basins, an extensive storm sewer system and the construction of an offsite drainage channel to transport storm water to a creek. The water main extension to serve the site was designed by the water utility; however, the layout and on-site water system was designed by Cripe.